The following list of roads are tentatively scheduled (weather dependent) to be milled / paved, starting Monday, June 1, 2026.
Freeman Drive: Christy Drive to Maken Drive
Metzler Street: Christy Drive to Maken Drive
Kerr Drive: Christy Drive to Newbaker Drive
Devon Drive: Christy Drive to Newbaker Drive
Christy Drive: Hostetler Road to Devon Drive
Annette Street: Freeman Drive to Owen Drive
Maken Drive: Freeman Drive to Devon Drive
Kenneth Avenue: Christy Drive to Erickson Drive
Norwood Street: Hostetler Road to Metzler Street
Olim Street: Bel Air Drive to Distance of Approx. 610’
Tener Street: Luray Avenue to Boxler Drive
Service Drive: Luray Avenue to Distance of Approx. 520’
Bel Air Drive: Service Drive to Luray Avenue
Boxler Drive: Olim Street to Township Line
The following road will be double seal coated (Date TBD)
Old Solomon Run Road: Walters Avenue to Township Line